3DAssets.dev

Free models · Game-ready GLB

Environments

Every environment below is a self-contained .glb under 25 MB that drops into three.js, Blender, Godot, Unity and Unreal, free to use and modify in commercial projects without attribution.

Load one straight from its CDN URL with a plain GLTFLoader, or take a whole environments set from the packs.

1,009 free GLB models

Guild Office (Adventurers Tavern and Guild Hall)

Guild Office (Adventurers Tavern and Guild Hall)

Open administrative office with registry desk, contracts, reward coffer and quest board on a continuous floor.

@3dassets18.3k tris · 11 ↓
Two-storey Tavern (Adventurers Tavern and Guild Hall)

Two-storey Tavern (Adventurers Tavern and Guild Hall)

Open cutaway tavern with a rear bar, hearth, dining area and a three-metre stair reaching the mezzanine. Front and roof omitted for inspection.

@3dassets27.3k tris · 20 ↓
Tavern Connector Cases (Adventurers Tavern and Guild Hall)

Tavern Connector Cases (Adventurers Tavern and Guild Hall)

Adjacent two-metre framed bays, floor panels and mezzanine rails demonstrate declared endpoints.

@3dassets6.9k tris · 12 ↓
Fixtures and motion yard (Animated Mechanisms Kit)

Fixtures and motion yard (Animated Mechanisms Kit)

Every rotating fixture, switch, hanging fitting and hazard in the kit laid out on a 6.4 m grid at real scale, five rows deep, so relative size and rest pose can be compared side by side. Large turning fixtures sit along the back, controls and hazards along the front.

@3dassets31.0k tris · 10 ↓
Door and gate wall (Animated Mechanisms Kit)

Door and gate wall (Animated Mechanisms Kit)

The eight wall bay doors tiled into one continuous 24 m wall at their rest pose, proving the shared 3 m bay module and its left and right connectors, with the four free standing gates set out in front of it.

@3dassets8.0k tris · 13 ↓
Working machine room (Animated Mechanisms Kit)

Working machine room (Animated Mechanisms Kit)

A plant floor on a 4.6 m grid: a bucket elevator, three conveyors and an inclined feed lift along the back, a gear train, crank and flywheel, piston assembly and stamping press through the middle, a scissor lift, gantry hoist, crusher and travelling saw, and a front row of...

@3dassets21.8k tris · 23 ↓
Connector Cases (Space Station and Docking Bays)

Connector Cases (Space Station and Docking Bays)

Independent test assemblies covering both port types: axial, radial and nadir hatch mates between modules, a berthing ring mated to a docking port, a ferry berthed to a logistics module, and truss mates joining bays, a rotary joint, an end cap, deployed and stowed...

@3dassets58.5k tris · 13 ↓
Interior Work Bay (Space Station and Docking Bays)

Interior Work Bay (Space Station and Docking Bays)

A 7 m stretch of pressurised interior: six payload racks facing each other in two liveries, a glovebox, sleep station, exercise device and hygiene stall along the aft wall, a stowage bag wall, cable run and ventilation duct on the port wall, a laptop station, a foot...

@3dassets11.6k tris · 18 ↓
Assembled Orbital Station (Space Station and Docking Bays)

Assembled Orbital Station (Space Station and Docking Bays)

Twelve pressurised elements bolted on the hatch grid around a six-port hub: a laboratory and node forward with a berthed crew ferry, a logistics module and airlock on the node radials, a cupola on the hub nadir, a tunnel, second node, habitation module, expandable habitat and...

@3dassets66.0k tris · 34 ↓
Docking Approach (Space Station and Docking Bays)

Docking Approach (Space Station and Docking Bays)

A four-port node with a laboratory, airlock and tunnel attached, its forward port left free with an alignment target and camera arm. A crew ferry holds 14 m out on the port axis and an automated freighter waits 34 m behind it, with a suited crew member on a manoeuvring unit...

@3dassets38.2k tris · 13 ↓
Drift run to the working face (Underground Mine and Shaft Works)

Drift run to the working face (Underground Mine and Shaft Works)

A development drift sequence: an incline ramp rising into a level run of rock, timbered and steel arch supported sections and a shotcrete lined length leading to a dead end working face, with the drilling jumbo set up at the face, a roof bolter behind it and ventilation duct...

@3dassets20.7k tris · 17 ↓
Shaft bottom station (Underground Mine and Shaft Works)

Shaft bottom station (Underground Mine and Shaft Works)

A shaft bottom station: the lined station chamber with the shaft above, the man cage on its guides and the skip loading pocket beside it; narrow gauge track running north through a cutaway review section to a battery locomotive and two ore cars; and a widened services chamber...

@3dassets13.8k tris · 26 ↓
Mine connector cases (Underground Mine and Shaft Works)

Mine connector cases (Underground Mine and Shaft Works)

Independent test rows proving each connector type: drift ports joining a straight to a curve, a tee, a cross, a ramp and a widened chamber; narrow gauge rail ports joining straight and curved panels through a turnout; and ventilation duct ports joining a straight run to a bend.

@3dassets11.2k tris · 10 ↓
Surface shaft headworks (Underground Mine and Shaft Works)

Surface shaft headworks (Underground Mine and Shaft Works)

The surface headworks: the headframe standing over the shaft collar with the man cage at the deck, the winder house facing it across the rope run, the main ventilation fan house on its plinth, the tipple and cars on the loading side, and stacked timber and stores.

@3dassets16.8k tris · 13 ↓
Shaft station chamber (Underground Mine and Shaft Works)Animated

Shaft station chamber (Underground Mine and Shaft Works)

An 8 m square shaft station excavated at 5.6 m clear height, with arched drift openings north and south, a 3.6 m by 2.4 m shaft opening through the back, a lined shaft sleeve above with buntons and guides, a steel roof frame and a named landing gate.

@3dassets936 tris · 13 ↓
Shaft station cutaway review section (Underground Mine and Shaft Works)Animated

Shaft station cutaway review section (Underground Mine and Shaft Works)

A review variant of the shaft station with the east wall removed so the landing, guides, shaft sleeve and station fittings can be inspected and photographed from the side.

@3dassets924 tris · 11 ↓
Drift incline ramp (Underground Mine and Shaft Works)

Drift incline ramp (Underground Mine and Shaft Works)

An 8 m ramp module climbing 1 m at one in eight between two drift ports, with a shotcrete invert strip, kerb and wall lights.

@3dassets1.5k tris · 12 ↓
Drift cutaway review section (Underground Mine and Shaft Works)

Drift cutaway review section (Underground Mine and Shaft Works)

A review variant of the straight drift with the east half of the rock shell removed so the arched section, ditch, bolting and services can be inspected from the side.

@3dassets688 tris · 8 ↓
Drift dead end working face (Underground Mine and Shaft Works)

Drift dead end working face (Underground Mine and Shaft Works)

A 4 m drift module closed by a blasted rock face with a drilled round pattern, a broken muck pile at the toe and a face inspection light. One open drift port.

@3dassets1.6k tris · 14 ↓
Widened drift chamber (Underground Mine and Shaft Works)

Widened drift chamber (Underground Mine and Shaft Works)

A 6 m by 8 m widened chamber module for parking, pumping or storage, with arched drift openings at both ends, a heavier steel roof frame and a raised concrete equipment plinth.

@3dassets636 tris · 10 ↓
Ore pass raise collar (Underground Mine and Shaft Works)

Ore pass raise collar (Underground Mine and Shaft Works)

A tipping point over an ore pass raise: a concrete collar around a 2 m square opening, heavy grizzly bars, a kickboard kerb, a side chute and a control stand.

@3dassets288 tris · 9 ↓
Widened chamber cutaway review section (Underground Mine and Shaft Works)

Widened chamber cutaway review section (Underground Mine and Shaft Works)

A review variant of the widened chamber with the east wall removed so the excavated interior, roof frame and equipment plinth can be inspected and photographed from the side.

@3dassets624 tris · 11 ↓
Left hand drift curve (Underground Mine and Shaft Works)

Left hand drift curve (Underground Mine and Shaft Works)

The mirrored quarter turn drift, running from the north face to the west face on the same 4 m radius grid.

@3dassets2.0k tris · 13 ↓
Steel arch set drift section (Underground Mine and Shaft Works)

Steel arch set drift section (Underground Mine and Shaft Works)

A 4 m drift section supported by four rolled steel arch ribs on foot plates with steel lagging channels spanning between the ribs and two tie rods.

@3dassets1.3k tris · 15 ↓