3DAssets.dev

Free models · CC0

Roads infrastructure

Every modern roads infrastructure below is a self-contained .glb under 5 MB, released under CC0 1.0 so it can be used and modified in commercial projects without attribution.

Load one straight from its CDN URL with a plain GLTFLoader, or take a whole roads infrastructure set from the packs.

232 free GLB models

Bay Markings Tile (Hospital Wards and Clinic Operations)

Bay Markings Tile (Hospital Wards and Clinic Operations)

Four metre ambulance bay floor tile: a paved slab with painted bay lines, a hatched keep-clear zone, a stop bar and a coloured standing box.

@3dassets188 tris
Fuel island (Ore Processing and Haulage Plant)

Fuel island (Ore Processing and Haulage Plant)

A fuel island on a concrete forecourt: a canopy on four columns with a hi-vis fascia and lights, a kerbed island with two dispensers, hoses and nozzles, a self bunded diesel tank with a ladder and handrailed top, fill pipework, bollards and a spill kit cabinet.

@3dassets1.2k tris
Slurry pipeline module, 16 m (Ore Processing and Haulage Plant)

Slurry pipeline module, 16 m (Ore Processing and Haulage Plant)

A 16 m module of slurry pipeline on concrete sleepers with steel saddles and clamps: a raised expansion loop, four bolted flange joints, a knife gate valve with a handwheel and a drain tee to a plinth.

@3dassets1.3k tris
Spillway chute and stilling basin (Ore Processing and Haulage Plant)

Spillway chute and stilling basin (Ore Processing and Haulage Plant)

A concrete spillway: an approach apron with a weir sill and stop log slots, a chute between training walls dropping to a stilling basin with two rows of baffle blocks and an end sill, handrails along both walls and riprap at the outlet.

@3dassets872 tris
Reclaim tunnel entrance (Ore Processing and Haulage Plant)

Reclaim tunnel entrance (Ore Processing and Haulage Plant)

The daylight end of a reclaim tunnel: a reinforced concrete portal with a headwall, soffit and flared wing walls, the stockpile embankment carried over it, and the reclaim conveyor climbing out on braced trestles with a walkway, handrails and a toe board.

@3dassets2.0k tris
Inclined feed conveyor flight, 44 m (Ore Processing and Haulage Plant)

Inclined feed conveyor flight, 44 m (Ore Processing and Haulage Plant)

A 44 m inclined conveyor flight climbing 12 m to a silo roof or transfer tower: stringers on two trestle bents and four braced lattice towers, a troughed belt on idlers, a climbing walkway with a toe board, and a head pulley, drive, chute and stair tower.

@3dassets8.9k tris
Rail loadout bin with clam gate (Ore Processing and Haulage Plant)

Rail loadout bin with clam gate (Ore Processing and Haulage Plant)

A rail loadout bin straddling standard gauge track on four braced lattice legs: a stiffened surge bin over a wedge hopper, a clam gate with two hinged leaves on rams, a telescopic spout with a dust skirt, an operator cabin and a stair tower.

@3dassets3.9k tris
Truck loadout bin (Ore Processing and Haulage Plant)

Truck loadout bin (Ore Processing and Haulage Plant)

A truck loadout bin on braced lattice legs over a concrete road lane: a surge bin with stiffener bands, a chute with a dust skirt, kerb wheel guides with hi-vis posts, a traffic light mast and boom, and a handrailed gate platform reached by a stair.

@3dassets1.9k tris
Weighbridge and kiosk (Ore Processing and Haulage Plant)

Weighbridge and kiosk (Ore Processing and Haulage Plant)

A pit mounted weighbridge: an 18 m steel deck on load cell mounts in a concrete pit, concrete approach ramps and guide kerbs, hi-vis edge rails, an indicator post with a display, a traffic light and a small weigh kiosk on its own pad.

@3dassets676 tris
Conveyor transfer tower (Ore Processing and Haulage Plant)

Conveyor transfer tower (Ore Processing and Haulage Plant)

An 18 m four leg braced lattice transfer tower: four handrailed grating decks, an internal stair tower, the incoming head pulley, snub pulley and drive at 14.4 m, a flanged chute dropping 3 m through a bend, and the outgoing belt tail turned 90 degrees at 11.4 m.

@3dassets7.2k tris
Conveyor tail pulley and take-up station (Ore Processing and Haulage Plant)

Conveyor tail pulley and take-up station (Ore Processing and Haulage Plant)

A 6 m conveyor tail station: a tail pulley on a braced frame, a feed hopper with angled skirt boards, and a gravity take-up with two bend pulleys, a guided counterweight box and its guide frame on a concrete pad.

@3dassets1.9k tris
Conveyor head pulley and drive station (Ore Processing and Haulage Plant)

Conveyor head pulley and drive station (Ore Processing and Haulage Plant)

A 6 m conveyor head station: a lagged head pulley in an A frame under the stringers, a snub pulley, a belt scraper, a gearbox and motor drive with a coupling guard, a flanged discharge chute to grade and a handrailed maintenance platform reached by a stair.

@3dassets2.9k tris
Elevated plant walkway module, 12 m (Ore Processing and Haulage Plant)

Elevated plant walkway module, 12 m (Ore Processing and Haulage Plant)

A 12 m elevated access walkway module on braced trestle bents with longitudinal X bracing: a grating deck on edge channels, handrails and toe boards both sides and a stair down to grade. It bolts alongside a conveyor run or between plant areas.

@3dassets1.1k tris
Conveyor gallery bridge, 12 m rising span (Ore Processing and Haulage Plant)

Conveyor gallery bridge, 12 m rising span (Ore Processing and Haulage Plant)

A 12 m conveyor gallery that climbs 3 m between transfer towers: the same braced through truss and sheeting with a rising bottom chord, stepped bearing shoes, the belt and idlers set on the slope and a climbing internal walkway.

@3dassets2.7k tris
Conveyor gallery bridge, 12 m level span (Ore Processing and Haulage Plant)

Conveyor gallery bridge, 12 m level span (Ore Processing and Haulage Plant)

A 12 m enclosed conveyor gallery that spans between transfer towers with no legs of its own: a braced through truss on bearing shoes, a grating floor, the belt on cross beams and troughing idlers, an internal walkway, side sheeting and a monopitch roof.

@3dassets2.7k tris
Overland conveyor module, 12 m straight (Ore Processing and Haulage Plant)

Overland conveyor module, 12 m straight (Ore Processing and Haulage Plant)

A 12 m level overland conveyor module: two stringers on braced trestle bents with longitudinal X bracing, a 1.2 m troughed belt on 35 degree three roll idlers, a return strand on flat idlers, and an access walkway on one side with handrails and a toe board.

@3dassets2.0k tris
Overland conveyor module, 12 m incline (Ore Processing and Haulage Plant)

Overland conveyor module, 12 m incline (Ore Processing and Haulage Plant)

A 12 m conveyor module climbing 3 m at 14 degrees: taller braced trestle bents toward the high end, the same troughed belt and idler set, a climbing walkway with handrails and a toe board, and a holdback drive on a plinth beside the low end.

@3dassets3.0k tris
Overland conveyor module, 30 degree horizontal curve (Ore Processing and Haulage Plant)

Overland conveyor module, 30 degree horizontal curve (Ore Processing and Haulage Plant)

A 12 m conveyor module turning 30 degrees on a 22.9 m radius: curved stringers on braced bents set square to the arc, the troughed belt and idler frames rotated to follow the curve, and a curved walkway with handrails and a toe board on the outside of the turn.

@3dassets3.2k tris
Truck dump pocket (Ore Processing and Haulage Plant)

Truck dump pocket (Ore Processing and Haulage Plant)

A reinforced concrete truck dump pocket: back and wing retaining walls, a sloping pocket floor, cast wheel stops with hi-vis kerbs, a static grizzly grating over the mouth, a dust curtain of hanging rubber strips on a portal frame, crest handrails and an access stair.

@3dassets1.5k tris
Service water line 4 m (Underground Mine and Shaft Works)

Service water line 4 m (Underground Mine and Shaft Works)

A 4 m run of 100 mm service water pipe on the same wall brackets, with a smaller isolating valve and a hose drop.

@3dassets594 tris
Cable tray run 4 m (Underground Mine and Shaft Works)

Cable tray run 4 m (Underground Mine and Shaft Works)

A 4 m ladder cable tray on wall brackets carrying two power cables and a communications cable, with rung spacing and marker plates.

@3dassets408 tris
Compressed air line 4 m (Underground Mine and Shaft Works)

Compressed air line 4 m (Underground Mine and Shaft Works)

A 4 m run of 180 mm compressed air pipe on wall brackets with bolted flanges, an isolating valve with a handwheel and a hose drop to a coupling.

@3dassets594 tris
Ventilation duct bend (Underground Mine and Shaft Works)

Ventilation duct bend (Underground Mine and Shaft Works)

A quarter turn of 1.1 m ventilation ducting on the 2 m radius grid, with flanges at both ends and two hanger brackets.

@3dassets672 tris
Ventilation duct run 4 m (Underground Mine and Shaft Works)

Ventilation duct run 4 m (Underground Mine and Shaft Works)

A 4 m run of 1.1 m rigid ventilation ducting with bolted flanges, roof hanger brackets and reflective marker plates.

@3dassets756 tris