Free models · CC0
Buildings
Every building below is a self-contained .glb under 5 MB, released under CC0 1.0 so it can be used and modified in commercial projects without attribution.
Load one straight from its CDN URL with a plain GLTFLoader, or take a whole buildings set from the packs.
1,566 free GLB models
Personnel access shaft cutaway (Cold War Missile Silo and Command Bunker)
An 8.6 m cutaway personnel shaft: a concrete shaft with a steel liner, two grating landings with handrails, a caged ladder run, a cable tray, a floor grating at the bottom and a collar with a hinged hatch at grade.
Silo exhaust duct headworks (Cold War Missile Silo and Command Bunker)
The exhaust duct headworks at grade: a battered concrete plinth with a rectangular throat built from four slabs, a recessed bore, a heavy grille, a curved deflector hood on struts, a cowled relief stack, a hinged deck cover and deck handrails.
Sliding silo blast door (Cold War Missile Silo and Command Bunker)
A ballistic sliding closure: a 6.2 m concrete slab with banded steel edges, lifting eyes and eight rollers, parked open at the far end of an 11.6 m twin rail track, with the bore ring at the closed end and a gas generator actuator with a push rod.
Silo headworks collar (Cold War Missile Silo and Command Bunker)
The reinforced concrete headworks around the tube bore at grade: a round apron, a raised curb with a steel closure seat, twin door track plinths with rolled rails, anchor blocks, a cable duct, a hinged personnel hatch and a lightning mast.
Launch tube cutaway section (Cold War Missile Silo and Command Bunker)
A cutaway section of a hardened launch tube: an 18 m concrete wall 0.52 m thick with a welded steel liner, stiffener rings, three grating work platforms with handrails, a caged ladder, cable raceways, a stepped launch mount and a hazard-banded muzzle seat.
Lamp room (Ore Processing and Haulage Plant)
A small clad monopitch lamp room: an entry canopy on posts over a concrete step, a wide issue hatch with a counter, three charging racks of cap lamps visible behind it, a rescuer cabinet and a notice board outside.
Modular site office (Ore Processing and Haulage Plant)
A modular site office on transport skids: a ribbed clad body with a window band both sides, a door with a canopy, a grating entry deck with handrails and a stair, two roof mounted air conditioners and a cable entry box.
Change house (Ore Processing and Haulage Plant)
A long clad gable change house: a covered entry walkway on columns with a handrail, double doors and window bands, five ridge ventilators, a boot wash trough with a hose reel and a bench outside.
Core shed (Ore Processing and Haulage Plant)
An open sided core shed: six portal frames on a concrete slab with knee braces, purlins and a monopitch sheeted roof, gutters and a downpipe, and cross bracing in the end bay.
Maintenance workshop (Ore Processing and Haulage Plant)
A tall clad gable workshop on a concrete hardstand: two roller doors, window bands and ribbed cladding, a monorail hoist beam projecting from the gable with a trolley and hook block, three roof ventilators, a lean-to store on one side and a kerbed wash bay with a parts rack.
Electrical MCC building (Ore Processing and Haulage Plant)
A clad monopitch switchroom: a ribbed sheet building on a raised plinth with louvred vents, double doors under a canopy with a handrailed landing, a cable ladder gantry into the back wall, trench covers and a fenced transformer bay.
Assay laboratory (Ore Processing and Haulage Plant)
A clad gable assay laboratory: a ribbed sheet building on a concrete plinth with a roller shutter, personnel door and canopy, window bands, four roof mounted fume extraction stacks with cowls, an air handling unit on brackets and a bottled gas cage.
Slurry pump house (Ore Processing and Haulage Plant)
A clad pump house on a bunded slab with the gable end open: a slurry pump volute and motor on a concrete plinth, suction and discharge pipework with a knife gate valve and a flanged nozzle, a gland water tank and a control cubicle outside.
Product silo cluster (Ore Processing and Haulage Plant)
Three concrete product silos on column bases: bolted ring beams and pile caps, discharge cones with slide gates and chutes, a linked steel roof deck with handrails, roof vents and access hatches, and a braced external stair tower with a landing.
Underground refuge chamber (Underground Mine and Shaft Works)
A six metre steel refuge chamber on skids with a sealed door, a viewing port, external breathing air cylinders, a scrubber cabinet, a roof beacon and an entry step with handrails.
Drainage sump (Underground Mine and Shaft Works)
A concrete drainage sump with an open pit, a removable steel grating over half the opening, a fixed access ladder and a suction pipe with a strainer.
Underground pump station (Underground Mine and Shaft Works)
A dewatering pump station: two horizontal pumps with motors on a concrete plinth, suction manifolds, a delivery header with valves and a control cabinet.
Ventilation airlock door (Underground Mine and Shaft Works)
A concrete bulkhead filling the drift section, with a framed vehicle opening closed by two named door leaves, a personnel door beside it and an airflow warning light.
Main ventilation fan house (Underground Mine and Shaft Works)
A surface main fan installation: an axial fan casing on a concrete plinth with an inlet bell and guard, an impeller, a motor with a drive guard, an evasé diffuser and a transition duct into the shaft collar.
Mine car tipple (Underground Mine and Shaft Works)
A timber framed tipple with an elevated track deck, a named tipping cradle, a receiving bin and a discharge chute.
Shaft loading pocket (Underground Mine and Shaft Works)
A steel measuring flask on a braced frame with a lower chute, a hydraulic sector gate and a control cabinet, used to load skips at the shaft bottom.
Shaft collar and deck (Underground Mine and Shaft Works)
A concrete shaft collar with a 3.6 m by 2.4 m hoisting opening, a steel deck, guide rails in the shaft, a perimeter handrail and a named swing gate at the loading side.
Sheave wheel stand (Underground Mine and Shaft Works)
A ground standing test and maintenance stand carrying two 3 m sheave wheels on a common shaft, with named rotation nodes and a bolted base frame.
Winder house (Underground Mine and Shaft Works)
A concrete winder house with an open front bay, a portal roof frame, a double drum winder on bearing pedestals, a gearbox, a motor and an operator control desk.