Free models · Game-ready GLB
Modern
Every realistic modern model below is a self-contained .glb under 25 MB that drops into three.js, Blender, Godot, Unity and Unreal, free to use and modify in commercial projects without attribution.
Load one straight from its CDN URL with a plain GLTFLoader, or take a whole themed set from the packs.
10,121 free GLB models
Narrow gauge track panel 4 m (Underground Mine and Shaft Works)
A 4 m panel of 750 mm gauge track: a ballast bed, timber sleepers on 0.6 m centres and flat bottom rail with the rail head 0.28 m above the drift floor.
Shaft loading pocket (Underground Mine and Shaft Works)
A steel measuring flask on a braced frame with a lower chute, a hydraulic sector gate and a control cabinet, used to load skips at the shaft bottom.
Shaft station chamber (Underground Mine and Shaft Works)
An 8 m square shaft station excavated at 5.6 m clear height, with arched drift openings north and south, a 3.6 m by 2.4 m shaft opening through the back, a lined shaft sleeve above with buntons and guides, a steel roof frame and a named landing gate.
Shaft station cutaway review section (Underground Mine and Shaft Works)
A review variant of the shaft station with the east wall removed so the landing, guides, shaft sleeve and station fittings can be inspected and photographed from the side.
Bottom dump ore skip (Underground Mine and Shaft Works)
A bottom dump hoisting skip with a stiffened plate body, guide shoes, a suspension bail with rope socket and a named hinged discharge door.
Shaft collar and deck (Underground Mine and Shaft Works)
A concrete shaft collar with a 3.6 m by 2.4 m hoisting opening, a steel deck, guide rails in the shaft, a perimeter handrail and a named swing gate at the loading side.
Shaft man cage (Underground Mine and Shaft Works)
A two deck steel man cage with a mesh enclosure, guide shoes, a suspension bail and rope socket, and two named swing gates on the open front.
Sheave wheel stand (Underground Mine and Shaft Works)
A ground standing test and maintenance stand carrying two 3 m sheave wheels on a common shaft, with named rotation nodes and a bolted base frame.
Winder house (Underground Mine and Shaft Works)
A concrete winder house with an open front bay, a portal roof frame, a double drum winder on bearing pedestals, a gearbox, a motor and an operator control desk.
Drift incline ramp (Underground Mine and Shaft Works)
An 8 m ramp module climbing 1 m at one in eight between two drift ports, with a shotcrete invert strip, kerb and wall lights.
Shaft headframe (Underground Mine and Shaft Works)
A four leg braced steel lattice headframe seventeen metres to the sheave deck, with two back legs on concrete pads, a caged access ladder, a handrailed sheave deck and two named sheave wheels carrying head ropes.
Drift cutaway review section (Underground Mine and Shaft Works)
A review variant of the straight drift with the east half of the rock shell removed so the arched section, ditch, bolting and services can be inspected from the side.
Drift dead end working face (Underground Mine and Shaft Works)
A 4 m drift module closed by a blasted rock face with a drilled round pattern, a broken muck pile at the toe and a face inspection light. One open drift port.
Widened drift chamber (Underground Mine and Shaft Works)
A 6 m by 8 m widened chamber module for parking, pumping or storage, with arched drift openings at both ends, a heavier steel roof frame and a raised concrete equipment plinth.
Ore pass raise collar (Underground Mine and Shaft Works)
A tipping point over an ore pass raise: a concrete collar around a 2 m square opening, heavy grizzly bars, a kickboard kerb, a side chute and a control stand.
Widened chamber cutaway review section (Underground Mine and Shaft Works)
A review variant of the widened chamber with the east wall removed so the excavated interior, roof frame and equipment plinth can be inspected and photographed from the side.
Left hand drift curve (Underground Mine and Shaft Works)
The mirrored quarter turn drift, running from the north face to the west face on the same 4 m radius grid.
Steel arch set drift section (Underground Mine and Shaft Works)
A 4 m drift section supported by four rolled steel arch ribs on foot plates with steel lagging channels spanning between the ribs and two tie rods.
Right hand drift curve (Underground Mine and Shaft Works)
A quarter turn drift on a 4 m radius grid, running from the north face to the east face with lights on the outer wall and a compressed air line following the curve.
Drift cross junction (Underground Mine and Shaft Works)
A 4 m flat backed four way intersection with arched drift openings on every side, four steel corner columns, a ring beam grid and roof bolts.
Timbered drift set section (Underground Mine and Shaft Works)
A 4 m drift section supported by four three-piece timber square sets with capping plates, angle braces and timber lagging packed against the back.
Straight mine drift 4 m (Underground Mine and Shaft Works)
A 4 m straight hard-rock drift module with a 3.2 m by 3.0 m arched clear section, thick rock shell, drainage ditch, resin rock bolts, a wall cable tray, compressed air and water lines and a bulkhead light.
Drift tee junction (Underground Mine and Shaft Works)
A 4 m flat backed intersection with three arched drift openings and a closed east wall, supported by four steel corner columns, a ring beam and roof bolts.
Shotcrete lined drift section (Underground Mine and Shaft Works)
A 4 m drift section finished with a sprayed shotcrete lining over welded mesh and resin bolts, with the ditch left open at the toe.