Free models · Game-ready GLB
Modern
Every realistic modern model below is a self-contained .glb under 25 MB that drops into three.js, Blender, Godot, Unity and Unreal, free to use and modify in commercial projects without attribution.
Load one straight from its CDN URL with a plain GLTFLoader, or take a whole themed set from the packs.
10,121 free GLB models
High speed power car (Modern Rail and Metro Network)
An original 20 m high speed power car with a long lofted nose, wrap-around cab glass and a raised pantograph.
Commuter electric multiple unit driving car (Modern Rail and Metro Network)
A 20.5 m commuter electric unit driving car with four double doors a side, a pantograph and third rail shoegear.
Metro driving car (Modern Rail and Metro Network)
A 17.7 m metro driving car with four double doors a side, third rail shoegear and a flat cab front.
Articulated low floor tram (Modern Rail and Metro Network)
A 24.8 m three section articulated low floor tram with raked cabs at both ends and a pantograph.
High speed trailer car (Modern Rail and Metro Network)
A 25.7 m high speed trailer car with gangways at both ends, eight window bays and plug doors.
Tram train unit (Modern Rail and Metro Network)
A 19.9 m two section tram train with heavy rail couplers, a pantograph and third rail shoegear.
Metro intermediate car (Modern Rail and Metro Network)
A 17.7 m metro intermediate car with gangway bellows at both ends and five double doors a side.
Regional diesel multiple unit driving car (Modern Rail and Metro Network)
A 23 m regional diesel unit driving car with a raked cab, underfloor engine raft and roof radiator pack.
Radial stacker, stockpile and reclaim tunnel (Ore Processing and Haulage Plant)
The stockpile yard: a conveyor tail station feeding a straight module, a 30 degree horizontal curve and another straight into the radial stacking conveyor, whose boom builds the coarse ore cone. The reclaim tunnel entrance sits at the toe of the pile with the reclaim belt...
Belt connector cases (Ore Processing and Haulage Plant)
Independent test rows proving the belt connector contract. Row one runs a tail station through a straight module, a 30 degree horizontal curve and a second straight into a head station at grade. Row two climbs from a tail station through a straight and an inclined module...
Milling and separation area (Ore Processing and Haulage Plant)
The grinding and separation half of the plant: the semi-autogenous mill and the ball mill side by side on their foundations, the hydrocyclone cluster on its lattice support between them, the thickener with its rake bridge, a bank of flotation cells feeding the filter press...
Ore plant overview, crusher to loadout (Ore Processing and Haulage Plant)
The plant spine in flow order: the truck dump pocket with its pedestal rock breaker feeding a vibrating grizzly feeder and the primary jaw crusher, an apron feeder onto the conveyor tail station, two straight overland modules, the 44 m inclined flight climbing to a transfer...
Tailings storage, water plant and site services (Ore Processing and Haulage Plant)
The water and services side of the plant: five tailings berm modules forming a length of dam crest with the decant tower and its catwalk out in the pond, the spillway chute and stilling basin at the end of the embankment, a slurry pump house feeding three pipeline modules...
Modular site office (Ore Processing and Haulage Plant)
A modular site office on transport skids: a ribbed clad body with a window band both sides, a door with a canopy, a grating entry deck with handrails and a stair, two roof mounted air conditioners and a cable entry box.
Fuel island (Ore Processing and Haulage Plant)
A fuel island on a concrete forecourt: a canopy on four columns with a hi-vis fascia and lights, a kerbed island with two dispensers, hoses and nozzles, a self bunded diesel tank with a ladder and handrailed top, fill pipework, bollards and a spill kit cabinet.
Core tray rack (Ore Processing and Haulage Plant)
A bolted steel core tray rack with cross braced ends and six shelf levels, each carrying four drill core trays with five channels of core and a hi-vis label strip.
Change house (Ore Processing and Haulage Plant)
A long clad gable change house: a covered entry walkway on columns with a handrail, double doors and window bands, five ridge ventilators, a boot wash trough with a hose reel and a bench outside.
Core shed (Ore Processing and Haulage Plant)
An open sided core shed: six portal frames on a concrete slab with knee braces, purlins and a monopitch sheeted roof, gutters and a downpipe, and cross bracing in the end bay.
Lamp room (Ore Processing and Haulage Plant)
A small clad monopitch lamp room: an entry canopy on posts over a concrete step, a wide issue hatch with a counter, three charging racks of cap lamps visible behind it, a rescuer cabinet and a notice board outside.
Maintenance workshop (Ore Processing and Haulage Plant)
A tall clad gable workshop on a concrete hardstand: two roller doors, window bands and ribbed cladding, a monorail hoist beam projecting from the gable with a trolley and hook block, three roof ventilators, a lean-to store on one side and a kerbed wash bay with a parts rack.
Electrical MCC building (Ore Processing and Haulage Plant)
A clad monopitch switchroom: a ribbed sheet building on a raised plinth with louvred vents, double doors under a canopy with a handrailed landing, a cable ladder gantry into the back wall, trench covers and a fenced transformer bay.
Assay laboratory (Ore Processing and Haulage Plant)
A clad gable assay laboratory: a ribbed sheet building on a concrete plinth with a roller shutter, personnel door and canopy, window bands, four roof mounted fume extraction stacks with cowls, an air handling unit on brackets and a bottled gas cage.
Spillway chute and stilling basin (Ore Processing and Haulage Plant)
A concrete spillway: an approach apron with a weir sill and stop log slots, a chute between training walls dropping to a stilling basin with two rows of baffle blocks and an end sill, handrails along both walls and riprap at the outlet.
Settling pond edge module (Ore Processing and Haulage Plant)
An 18 m module of settling pond edge: a compacted bank with a placed gravel beach, the water surface, a silt fence on stakes along the crest, a staff gauge at the water line, an outlet pipe through the bank to a headwall and a short handrail run.