
About
An 18 m module of settling pond edge: a compacted bank with a placed gravel beach, the water surface, a silt fence on stakes along the crest, a staff gauge at the water line, an outlet pipe through the bank to a headwall and a short handrail run. Dimensions 20.00 by 3.67 by 18.00 m (X by Y by Z), metre units, +Y up, +Z forward, resting on y=0. Static geometry; no rig, collision or navigation data.
Use with an AI agent
Copy this prompt into your AI chat, then describe what you want to build with the asset.
Use the “Settling pond edge module (Ore Processing and Haulage Plant)” asset in my project. Model: https://cdn.3dassets.dev/assets/13443/v1/model.glb Asset page: https://3dassets.dev/assets/ore-processing-and-haulage-plant-settling-pond-edge-e28c77f9 Description: An 18 m module of settling pond edge: a compacted bank with a placed gravel beach, the water surface, a silt fence on stakes along the crest, a staff gauge at the water line, an outlet pipe through the bank to a headwall and a short handrail run. - Dimensions (X × Y × Z): 20 × 3.673 × 18 metres - Triangles: 718 - Animations: none - Licence: CC0 1.0 Universal (https://creativecommons.org/publicdomain/zero/1.0/) - Loading: Three.js GLTFLoader; no additional decoders required.
Also available as JSON, Markdown, or via the MCP server.
Import manually
Choose your framework, then copy the code into your project to load the asset.
import { GLTFLoader } from 'three/addons/loaders/GLTFLoader.js'
const loader = new GLTFLoader()
loader.load('https://cdn.3dassets.dev/assets/13443/v1/model.glb', (gltf) => {
scene.add(gltf.scene)
})Settling pond edge module (Ore Processing and Haulage Plant)
An 18 m module of settling pond edge: a compacted bank with a placed gravel beach, the water surface, a silt fence on stakes along the crest, a staff gauge at the water line, an outlet pipe through the bank to a headwall and a short handrail run.