Free models · CC0
Modular
Every model below is a self-contained .glb under 5 MB, released under CC0 1.0 so it can be used and modified in commercial projects without attribution.
Load one straight from its CDN URL with a plain GLTFLoader, or take a whole themed set from the packs.
1,654 free GLB models
Cable tray run 4 m (Underground Mine and Shaft Works)
A 4 m ladder cable tray on wall brackets carrying two power cables and a communications cable, with rung spacing and marker plates.
Compressed air line 4 m (Underground Mine and Shaft Works)
A 4 m run of 180 mm compressed air pipe on wall brackets with bolted flanges, an isolating valve with a handwheel and a hose drop to a coupling.
Ventilation duct bend (Underground Mine and Shaft Works)
A quarter turn of 1.1 m ventilation ducting on the 2 m radius grid, with flanges at both ends and two hanger brackets.
Ventilation duct run 4 m (Underground Mine and Shaft Works)
A 4 m run of 1.1 m rigid ventilation ducting with bolted flanges, roof hanger brackets and reflective marker plates.
Narrow gauge track curve (Underground Mine and Shaft Works)
A quarter turn of 750 mm gauge track on the same 4 m radius as the drift curve, with radial sleepers and a two part rail section.
Narrow gauge turnout (Underground Mine and Shaft Works)
A 4 m turnout panel with point blades, a stretcher bar, a hand throw stand with a target and a short diverging spur leaving to the east.
Narrow gauge track panel 4 m (Underground Mine and Shaft Works)
A 4 m panel of 750 mm gauge track: a ballast bed, timber sleepers on 0.6 m centres and flat bottom rail with the rail head 0.28 m above the drift floor.
Shaft station cutaway review section (Underground Mine and Shaft Works)
A review variant of the shaft station with the east wall removed so the landing, guides, shaft sleeve and station fittings can be inspected and photographed from the side.
Shaft station chamber (Underground Mine and Shaft Works)
An 8 m square shaft station excavated at 5.6 m clear height, with arched drift openings north and south, a 3.6 m by 2.4 m shaft opening through the back, a lined shaft sleeve above with buntons and guides, a steel roof frame and a named landing gate.
Drift cutaway review section (Underground Mine and Shaft Works)
A review variant of the straight drift with the east half of the rock shell removed so the arched section, ditch, bolting and services can be inspected from the side.
Drift dead end working face (Underground Mine and Shaft Works)
A 4 m drift module closed by a blasted rock face with a drilled round pattern, a broken muck pile at the toe and a face inspection light. One open drift port.
Widened chamber cutaway review section (Underground Mine and Shaft Works)
A review variant of the widened chamber with the east wall removed so the excavated interior, roof frame and equipment plinth can be inspected and photographed from the side.
Widened drift chamber (Underground Mine and Shaft Works)
A 6 m by 8 m widened chamber module for parking, pumping or storage, with arched drift openings at both ends, a heavier steel roof frame and a raised concrete equipment plinth.
Drift incline ramp (Underground Mine and Shaft Works)
An 8 m ramp module climbing 1 m at one in eight between two drift ports, with a shotcrete invert strip, kerb and wall lights.
Drift tee junction (Underground Mine and Shaft Works)
A 4 m flat backed intersection with three arched drift openings and a closed east wall, supported by four steel corner columns, a ring beam and roof bolts.
Drift cross junction (Underground Mine and Shaft Works)
A 4 m flat backed four way intersection with arched drift openings on every side, four steel corner columns, a ring beam grid and roof bolts.
Left hand drift curve (Underground Mine and Shaft Works)
The mirrored quarter turn drift, running from the north face to the west face on the same 4 m radius grid.
Right hand drift curve (Underground Mine and Shaft Works)
A quarter turn drift on a 4 m radius grid, running from the north face to the east face with lights on the outer wall and a compressed air line following the curve.
Steel arch set drift section (Underground Mine and Shaft Works)
A 4 m drift section supported by four rolled steel arch ribs on foot plates with steel lagging channels spanning between the ribs and two tie rods.
Shotcrete lined drift section (Underground Mine and Shaft Works)
A 4 m drift section finished with a sprayed shotcrete lining over welded mesh and resin bolts, with the ditch left open at the toe.
Timbered drift set section (Underground Mine and Shaft Works)
A 4 m drift section supported by four three-piece timber square sets with capping plates, angle braces and timber lagging packed against the back.
Straight mine drift 4 m (Underground Mine and Shaft Works)
A 4 m straight hard-rock drift module with a 3.2 m by 3.0 m arched clear section, thick rock shell, drainage ditch, resin rock bolts, a wall cable tray, compressed air and water lines and a bulkhead light.
Island platform end ramp (Modern Rail and Metro Network)
A 6 m island platform end ramp falling from full deck height to the track formation.
Right hand turnout (Modern Rail and Metro Network)
A 12 m right hand turnout, the handed pair to the left hand unit.