3DAssets.dev

Free models · CC0

Modular

Every model below is a self-contained .glb under 5 MB, released under CC0 1.0 so it can be used and modified in commercial projects without attribution.

Load one straight from its CDN URL with a plain GLTFLoader, or take a whole themed set from the packs.

1,654 free GLB models

Cable tray run 4 m (Underground Mine and Shaft Works)

Cable tray run 4 m (Underground Mine and Shaft Works)

A 4 m ladder cable tray on wall brackets carrying two power cables and a communications cable, with rung spacing and marker plates.

@3dassets408 tris
Compressed air line 4 m (Underground Mine and Shaft Works)

Compressed air line 4 m (Underground Mine and Shaft Works)

A 4 m run of 180 mm compressed air pipe on wall brackets with bolted flanges, an isolating valve with a handwheel and a hose drop to a coupling.

@3dassets594 tris
Ventilation duct bend (Underground Mine and Shaft Works)

Ventilation duct bend (Underground Mine and Shaft Works)

A quarter turn of 1.1 m ventilation ducting on the 2 m radius grid, with flanges at both ends and two hanger brackets.

@3dassets672 tris
Ventilation duct run 4 m (Underground Mine and Shaft Works)

Ventilation duct run 4 m (Underground Mine and Shaft Works)

A 4 m run of 1.1 m rigid ventilation ducting with bolted flanges, roof hanger brackets and reflective marker plates.

@3dassets756 tris
Narrow gauge track curve (Underground Mine and Shaft Works)

Narrow gauge track curve (Underground Mine and Shaft Works)

A quarter turn of 750 mm gauge track on the same 4 m radius as the drift curve, with radial sleepers and a two part rail section.

@3dassets828 tris
Narrow gauge turnout (Underground Mine and Shaft Works)

Narrow gauge turnout (Underground Mine and Shaft Works)

A 4 m turnout panel with point blades, a stretcher bar, a hand throw stand with a target and a short diverging spur leaving to the east.

@3dassets616 tris
Narrow gauge track panel 4 m (Underground Mine and Shaft Works)

Narrow gauge track panel 4 m (Underground Mine and Shaft Works)

A 4 m panel of 750 mm gauge track: a ballast bed, timber sleepers on 0.6 m centres and flat bottom rail with the rail head 0.28 m above the drift floor.

@3dassets172 tris
Shaft station cutaway review section (Underground Mine and Shaft Works)

Shaft station cutaway review section (Underground Mine and Shaft Works)

A review variant of the shaft station with the east wall removed so the landing, guides, shaft sleeve and station fittings can be inspected and photographed from the side.

@3dassets924 tris
Shaft station chamber (Underground Mine and Shaft Works)

Shaft station chamber (Underground Mine and Shaft Works)

An 8 m square shaft station excavated at 5.6 m clear height, with arched drift openings north and south, a 3.6 m by 2.4 m shaft opening through the back, a lined shaft sleeve above with buntons and guides, a steel roof frame and a named landing gate.

@3dassets936 tris
Drift cutaway review section (Underground Mine and Shaft Works)

Drift cutaway review section (Underground Mine and Shaft Works)

A review variant of the straight drift with the east half of the rock shell removed so the arched section, ditch, bolting and services can be inspected from the side.

@3dassets688 tris
Drift dead end working face (Underground Mine and Shaft Works)

Drift dead end working face (Underground Mine and Shaft Works)

A 4 m drift module closed by a blasted rock face with a drilled round pattern, a broken muck pile at the toe and a face inspection light. One open drift port.

@3dassets1.6k tris
Widened chamber cutaway review section (Underground Mine and Shaft Works)

Widened chamber cutaway review section (Underground Mine and Shaft Works)

A review variant of the widened chamber with the east wall removed so the excavated interior, roof frame and equipment plinth can be inspected and photographed from the side.

@3dassets624 tris
Widened drift chamber (Underground Mine and Shaft Works)

Widened drift chamber (Underground Mine and Shaft Works)

A 6 m by 8 m widened chamber module for parking, pumping or storage, with arched drift openings at both ends, a heavier steel roof frame and a raised concrete equipment plinth.

@3dassets636 tris
Drift incline ramp (Underground Mine and Shaft Works)

Drift incline ramp (Underground Mine and Shaft Works)

An 8 m ramp module climbing 1 m at one in eight between two drift ports, with a shotcrete invert strip, kerb and wall lights.

@3dassets1.5k tris
Drift tee junction (Underground Mine and Shaft Works)

Drift tee junction (Underground Mine and Shaft Works)

A 4 m flat backed intersection with three arched drift openings and a closed east wall, supported by four steel corner columns, a ring beam and roof bolts.

@3dassets972 tris
Drift cross junction (Underground Mine and Shaft Works)

Drift cross junction (Underground Mine and Shaft Works)

A 4 m flat backed four way intersection with arched drift openings on every side, four steel corner columns, a ring beam grid and roof bolts.

@3dassets1.0k tris
Left hand drift curve (Underground Mine and Shaft Works)

Left hand drift curve (Underground Mine and Shaft Works)

The mirrored quarter turn drift, running from the north face to the west face on the same 4 m radius grid.

@3dassets2.0k tris
Right hand drift curve (Underground Mine and Shaft Works)

Right hand drift curve (Underground Mine and Shaft Works)

A quarter turn drift on a 4 m radius grid, running from the north face to the east face with lights on the outer wall and a compressed air line following the curve.

@3dassets2.0k tris
Steel arch set drift section (Underground Mine and Shaft Works)

Steel arch set drift section (Underground Mine and Shaft Works)

A 4 m drift section supported by four rolled steel arch ribs on foot plates with steel lagging channels spanning between the ribs and two tie rods.

@3dassets1.3k tris
Shotcrete lined drift section (Underground Mine and Shaft Works)

Shotcrete lined drift section (Underground Mine and Shaft Works)

A 4 m drift section finished with a sprayed shotcrete lining over welded mesh and resin bolts, with the ditch left open at the toe.

@3dassets1.6k tris
Timbered drift set section (Underground Mine and Shaft Works)

Timbered drift set section (Underground Mine and Shaft Works)

A 4 m drift section supported by four three-piece timber square sets with capping plates, angle braces and timber lagging packed against the back.

@3dassets856 tris
Straight mine drift 4 m (Underground Mine and Shaft Works)

Straight mine drift 4 m (Underground Mine and Shaft Works)

A 4 m straight hard-rock drift module with a 3.2 m by 3.0 m arched clear section, thick rock shell, drainage ditch, resin rock bolts, a wall cable tray, compressed air and water lines and a bulkhead light.

@3dassets1.0k tris
Island platform end ramp (Modern Rail and Metro Network)

Island platform end ramp (Modern Rail and Metro Network)

A 6 m island platform end ramp falling from full deck height to the track formation.

@3dassets152 tris
Right hand turnout (Modern Rail and Metro Network)

Right hand turnout (Modern Rail and Metro Network)

A 12 m right hand turnout, the handed pair to the left hand unit.

@3dassets5.2k tris