3DAssets.dev

Free models · CC0

Environments

Every environment below is a self-contained .glb under 25 MB, released under CC0 1.0 so it can be used and modified in commercial projects without attribution.

Load one straight from its CDN URL with a plain GLTFLoader, or take a whole environments set from the packs.

644 free GLB models

Farm track module, corner (Arable Fields and Farm Machinery)

Farm track module, corner (Arable Fields and Farm Machinery)

An 8 m farm track tile turning through ninety degrees, joining a track running north to one running east.

@3dassets346 tris
Farm track module, straight (Arable Fields and Farm Machinery)

Farm track module, straight (Arable Fields and Farm Machinery)

An 8 m farm track tile: a 3.4 m stone track with a grass strip down the middle of the wheelings and grass verges on both sides.

@3dassets464 tris
Field tile, ditch edge (Arable Fields and Farm Machinery)

Field tile, ditch edge (Arable Fields and Farm Machinery)

An 8 m field tile cut by a drainage ditch along one edge, with grass margins on both banks and cereal rows on the cropped side.

@3dassets1.5k tris
Field tile, headland turn (Arable Fields and Farm Machinery)

Field tile, headland turn (Arable Fields and Farm Machinery)

An 8 m field tile of a worked headland: a cultivated turning strip along one edge, standing crop behind it and curved turn marks in the soil.

@3dassets1.4k tris
Field tile, tramline through wheat (Arable Fields and Farm Machinery)

Field tile, tramline through wheat (Arable Fields and Farm Machinery)

An 8 m field tile of standing wheat split by a sprayer tramline: two bare wheelings about 2 m apart with crop either side.

@3dassets1.4k tris
Field tile, standing maize (Arable Fields and Farm Machinery)

Field tile, standing maize (Arable Fields and Farm Machinery)

An 8 m field tile of standing maize: eleven rows at 0.71 m spacing rising to about 2.2 m, with tassels above the canopy.

@3dassets2.0k tris
Field tile, standing wheat (Arable Fields and Farm Machinery)

Field tile, standing wheat (Arable Fields and Farm Machinery)

An 8 m field tile of ripe standing wheat: a continuous canopy just under a metre tall with an uneven top and taller stems breaking the surface.

@3dassets1.8k tris
Field tile, young crop (Arable Fields and Farm Machinery)

Field tile, young crop (Arable Fields and Farm Machinery)

An 8 m field tile of a young cereal crop: green rows about 0.3 m tall standing over the drill rows.

@3dassets2.0k tris
Field tile, drilled seedbed (Arable Fields and Farm Machinery)

Field tile, drilled seedbed (Arable Fields and Farm Machinery)

An 8 m field tile of a fine drilled seedbed: shallow drill rows across the tile with a pair of tramline wheelings pressed into the tilth.

@3dassets636 tris
Field tile, ploughed (Arable Fields and Farm Machinery)

Field tile, ploughed (Arable Fields and Farm Machinery)

An 8 m field tile of freshly turned furrows, seventeen ridges running the length of the tile with broken clods on top.

@3dassets664 tris
Field tile, cereal stubble (Arable Fields and Farm Machinery)

Field tile, cereal stubble (Arable Fields and Farm Machinery)

An 8 m field tile of cut cereal stubble: rows of clipped straw stems over worked soil, with combine wheelings and loose straw.

@3dassets2.2k tris
Partition Connector Cases (Hospital Wards and Clinic Operations)

Partition Connector Cases (Hospital Wards and Clinic Operations)

Composed example for Hospital Wards and Clinic Operations.

@3dassets2.7k tris
Reception And Waiting Hall (Hospital Wards and Clinic Operations)

Reception And Waiting Hall (Hospital Wards and Clinic Operations)

Composed example for Hospital Wards and Clinic Operations.

@3dassets11.9k tris
Operating Theatre (Hospital Wards and Clinic Operations)

Operating Theatre (Hospital Wards and Clinic Operations)

Composed example for Hospital Wards and Clinic Operations.

@3dassets8.7k tris
Six Bed Ward Bay (Hospital Wards and Clinic Operations)

Six Bed Ward Bay (Hospital Wards and Clinic Operations)

Composed example for Hospital Wards and Clinic Operations.

@3dassets11.5k tris
Drift run to the working face (Underground Mine and Shaft Works)

Drift run to the working face (Underground Mine and Shaft Works)

Composed example for Underground Mine and Shaft Works.

@3dassets20.7k tris
Surface shaft headworks (Underground Mine and Shaft Works)

Surface shaft headworks (Underground Mine and Shaft Works)

Composed example for Underground Mine and Shaft Works.

@3dassets16.8k tris
Mine connector cases (Underground Mine and Shaft Works)

Mine connector cases (Underground Mine and Shaft Works)

Composed example for Underground Mine and Shaft Works.

@3dassets11.1k tris
Shaft bottom station (Underground Mine and Shaft Works)

Shaft bottom station (Underground Mine and Shaft Works)

Composed example for Underground Mine and Shaft Works.

@3dassets13.8k tris · 1 ↓
Shaft station cutaway review section (Underground Mine and Shaft Works)Animated

Shaft station cutaway review section (Underground Mine and Shaft Works)

A review variant of the shaft station with the east wall removed so the landing, guides, shaft sleeve and station fittings can be inspected and photographed from the side.

@3dassets924 tris
Shaft station chamber (Underground Mine and Shaft Works)Animated

Shaft station chamber (Underground Mine and Shaft Works)

An 8 m square shaft station excavated at 5.6 m clear height, with arched drift openings north and south, a 3.6 m by 2.4 m shaft opening through the back, a lined shaft sleeve above with buntons and guides, a steel roof frame and a named landing gate.

@3dassets936 tris
Drift cutaway review section (Underground Mine and Shaft Works)

Drift cutaway review section (Underground Mine and Shaft Works)

A review variant of the straight drift with the east half of the rock shell removed so the arched section, ditch, bolting and services can be inspected from the side.

@3dassets688 tris
Ore pass raise collar (Underground Mine and Shaft Works)

Ore pass raise collar (Underground Mine and Shaft Works)

A tipping point over an ore pass raise: a concrete collar around a 2 m square opening, heavy grizzly bars, a kickboard kerb, a side chute and a control stand.

@3dassets288 tris
Drift dead end working face (Underground Mine and Shaft Works)

Drift dead end working face (Underground Mine and Shaft Works)

A 4 m drift module closed by a blasted rock face with a drilled round pattern, a broken muck pile at the toe and a face inspection light. One open drift port.

@3dassets1.6k tris