
About
A concrete spillway: an approach apron with a weir sill and stop log slots, a chute between training walls dropping to a stilling basin with two rows of baffle blocks and an end sill, handrails along both walls and riprap at the outlet. Dimensions 6.32 by 7.57 by 23.25 m (X by Y by Z), metre units, +Y up, +Z forward, resting on y=0. Static geometry; no rig, collision or navigation data.
Use with an AI agent
Copy this prompt into your AI chat, then describe what you want to build with the asset.
Use the “Spillway chute and stilling basin (Ore Processing and Haulage Plant)” asset in my project. Model: https://cdn.3dassets.dev/assets/11706/v1/model.glb Asset page: https://3dassets.dev/assets/ore-processing-and-haulage-plant-spillway-chute-087ec389 Description: A concrete spillway: an approach apron with a weir sill and stop log slots, a chute between training walls dropping to a stilling basin with two rows of baffle blocks and an end sill, handrails along both walls and riprap at the outlet. - Dimensions (X × Y × Z): 6.321 × 7.573 × 23.253 metres - Triangles: 872 - Animations: none - Licence: CC0 1.0 Universal (https://creativecommons.org/publicdomain/zero/1.0/) - Loading: Three.js GLTFLoader; no additional decoders required.
Also available as JSON, Markdown, or via the MCP server.
Import manually
Choose your framework, then copy the code into your project to load the asset.
import { GLTFLoader } from 'three/addons/loaders/GLTFLoader.js'
const loader = new GLTFLoader()
loader.load('https://cdn.3dassets.dev/assets/11706/v1/model.glb', (gltf) => {
scene.add(gltf.scene)
})Spillway chute and stilling basin (Ore Processing and Haulage Plant)
A concrete spillway: an approach apron with a weir sill and stop log slots, a chute between training walls dropping to a stilling basin with two rows of baffle blocks and an end sill, handrails along both walls and riprap at the outlet.