
About
Original concrete and teal hydroelectric station with bolted pressure route, separate spillway and stilling basin, complete glazed powerhouse and accessible maintenance yard. Metres, +Y up, +Z forward. Static machinery and water; no flow, electrical, navigation or collision simulation.
Files load directly from the CDN. Choose the pieces you need. Colliders, navigation and gameplay scripts are supplied by your game.
Use with an AI agent
Copy this prompt into your AI chat, then describe what you want to build with the pack.
Use the “Hydroelectric Dam Infiltration” pack in my project. Manifest (JSON, every model with its CDN URL): https://3dassets.dev/api/v1/packs/hydroelectric-dam-infiltration Starter scene (one GLB with every piece placed): https://cdn.3dassets.dev/assets/29379/v1/model.glb Pack page: https://3dassets.dev/packs/hydroelectric-dam-infiltration Description: Fifty premium dam, generation, pressure-pipe and maintenance designs for industrial infiltration scenes. - 51 GLB models, 11.5 MB in total - Units: metres, +Y up, shared scale and palette across the pack - Licence: CC0 1.0 Universal (no attribution required) - Loading: three.js GLTFLoader; no additional decoders required. Load models individually from the manifest, or the starter scene as one file.
Also available as a JSON manifest or via the MCP server.
Common questions
How do I use Hydroelectric Dam Infiltration with my AI development tools?
How do I get started?
Which game engines and tools can I use Hydroelectric Dam Infiltration with?
How do I import this pack into Unity, Godot, Unreal or Blender?
Can I use Hydroelectric Dam Infiltration in a commercial game, and do I need to credit anyone?
Can I load it from the CDN instead of downloading it?
Do I have to download the whole pack?
Do the models in Hydroelectric Dam Infiltration fit together?
Game kit
Hydroelectric Dam Infiltration
Fifty premium dam, generation, pressure-pipe and maintenance designs for industrial infiltration scenes.
One GLB with every piece placed in a starter scene. Each model is also below on its own.
Everything in this pack
Dam Wall Straight (Hydroelectric Dam Infiltration)
Four-metre concrete dam bay with downstream buttresses, tie-heads and formwork seams.
Dam Wall Return (Hydroelectric Dam Infiltration)
L-shaped six-metre dam return tying the crest into a riverbank abutment.
Abutment (Hydroelectric Dam Infiltration)
Stepped mass-concrete bank abutment with crown blocks and broad retaining foot.
Crest Roadway (Hydroelectric Dam Infiltration)
Four-metre crest roadway slab with narrow safety edge markings and raised concrete verges.
Crest Barrier (Hydroelectric Dam Infiltration)
Heavy concrete crest traffic barrier with a profiled base and metal coping.
Spillway Gate (Hydroelectric Dam Infiltration)
Four-metre vertical spillway gate bay with stiffened gate leaf, twin screw lifts and crest crossbeam. Gate remains closed.
Spillway Chute (Hydroelectric Dam Infiltration)
Eight-metre stepped spillway chute dropping 3.6 metres, with continuous raised sidewalls and energy-dissipating steps.
Stilling Basin (Hydroelectric Dam Infiltration)
Six-metre open stilling basin with nine baffle blocks, sidewalls and a static shallow water surface.
Intake Tower (Hydroelectric Dam Infiltration)
Tall enclosed intake tower with outlet flange at the one-metre hydraulic datum, roofed gate operator and open rack face.
Trash Rack (Hydroelectric Dam Infiltration)
Four-metre intake screen with fifteen spaced bars, four crossrails and thick surrounding frame.
Rack Cleaning Carriage (Hydroelectric Dam Infiltration)
Rack-cleaning trolley with four rail wheels, winch housing, guide arm and comb rake. Static mechanism.
Penstock Straight (Hydroelectric Dam Infiltration)
Two-metre hollow pressure pipe with thick bore, end flanges and twelve bolts per end.
Penstock Elbow (Hydroelectric Dam Infiltration)
One-metre-radius quarter-turn pressure elbow with bolted entry and exit flanges. Continuous inward-facing bore lining and annular end thickness.
Penstock Reducer (Hydroelectric Dam Infiltration)
One-metre tapered pressure reducer from 900 mm to 600 mm outer diameter.
Penstock Support (Hydroelectric Dam Infiltration)
Concrete pressure-pipe saddle with a complete steel support band and anchor studs.
Expansion Joint (Hydroelectric Dam Infiltration)
Half-metre bellows expansion joint with five corrugations between bolted flanges.
Butterfly Valve (Hydroelectric Dam Infiltration)
Bolted butterfly shutoff valve with stem gearbox, spoked handwheel and thick open pipe body; internal disc is static.
Turbine Casing (Hydroelectric Dam Infiltration)
Compact turbine pressure casing on a concrete plinth with bolted crown, inlet reducer flange and draft outlet. Enclosed rotor is not modelled.
Generator Housing (Hydroelectric Dam Infiltration)
Vertical generator housing with radial cooling ribs, terminal box, mounting ring and end cap; fits turbine crown.
Governor Cabinet (Hydroelectric Dam Infiltration)
Turbine governor cabinet with screened operator panel, toggle controls, hinges and recessed service door.
Control Console (Hydroelectric Dam Infiltration)
Standing control desk with wide status screen, three rotary controls and braced lower shelf.
Transformer (Hydroelectric Dam Infiltration)
Oil-cooled transformer with finned radiator banks, three ribbed bushings and bolted skid.
Switchgear (Hydroelectric Dam Infiltration)
Double-height switchgear cubicle with deadfront panel, handle and lower ventilation strips.
Insulator Bank (Hydroelectric Dam Infiltration)
Three tall porcelain standoff insulators with seven sheds each and copper terminal studs.
Cable Trench (Hydroelectric Dam Infiltration)
Two-metre open concrete cable trough with three separate insulated cable runs.
Cable Trench Corner (Hydroelectric Dam Infiltration)
Right-angle concrete cable trough with curved cable dressing and thick outer retaining walls.
Trench Cover (Hydroelectric Dam Infiltration)
One-metre steel trench cover with paired lifting slots and anti-slip ribs.
Maintenance Gantry (Hydroelectric Dam Infiltration)
Four-metre portable maintenance gantry with I-section beam, gusseted columns and broad feet.
Chain Hoist (Hydroelectric Dam Infiltration)
Travelling trolley hoist with alternating chain links and bottom lifting hook. Model origin lies beneath hanging hook.
Workshop Bench (Hydroelectric Dam Infiltration)
Steel maintenance bench with bolted vice, opposed jaws, screw handle and lower tool shelf.
Turbine Lifting Cradle (Hydroelectric Dam Infiltration)
Braced turbine service cradle with four inward-facing padded saddles and broad forklift base.
Tool Cabinet (Hydroelectric Dam Infiltration)
Four-drawer maintenance tool cabinet with individual drawer fronts, pulls and corner guards.
Lubrication Skid (Hydroelectric Dam Infiltration)
Oil lubrication skid with reservoir, filter canister, copper delivery line and service panel.
Cooling Pump (Hydroelectric Dam Infiltration)
Centrifugal cooling pump with finned motor, bolted skid and supported copper service line connecting 1.1 m east and 1.3 m rearward to turbine coolant inlet.
Drainage Sump (Hydroelectric Dam Infiltration)
Concrete drainage sump with raised metal grating and open collection void beneath.
Pressure Gauge Manifold (Hydroelectric Dam Infiltration)
Three upright pressure gauges with dial faces, needles and separate copper sensing stems.
Flow Meter (Hydroelectric Dam Infiltration)
Flanged flow meter spool with raised transmitter and front digital indicator.
Access Hatch (Hydroelectric Dam Infiltration)
Square bolted access hatch with thick stepped cover, corner fasteners and recessed pull ring.
Ladder Cage (Hydroelectric Dam Infiltration)
Three-metre fixed access ladder with eleven rungs and four protective cage hoops.
Service Stair (Hydroelectric Dam Infiltration)
Eight-step service stair rising 1.4 metres with steel treads, inclined stringers and dual safety handrails.
Safety Rail Straight (Hydroelectric Dam Infiltration)
Two-metre safety railing with double rails, kickplate and foot plates.
Rail Corner (Hydroelectric Dam Infiltration)
Right-angle safety rail corner with continuous lower kickplates and top handrails.
Rail End (Hydroelectric Dam Infiltration)
Terminating safety rail with a short returned handhold to prevent exposed ends.
Security Gate (Hydroelectric Dam Infiltration)
Three-metre twin-leaf vertical-bar security gate with latch, posts and closed static leaves.
Roofed Powerhouse (Hydroelectric Dam Infiltration)
Closed powerhouse with concrete sides, complete glazed roof and front glazing, service door and a low tailrace penetration. Five-metre square footprint. Roof glazing reveals machinery without a cutaway.
Guard Cabin (Hydroelectric Dam Infiltration)
Roofed security cabin with separate door, observation window, projecting eaves and concrete threshold.
Warning Sign (Hydroelectric Dam Infiltration)
Freestanding warning plate with raised exclamation symbol on a galvanized post.
Life Ring Station (Hydroelectric Dam Infiltration)
Riverside rescue station with ring buoy, rope loop and storage box.
Floodlight Mast (Hydroelectric Dam Infiltration)
Four-metre anchored floodlight pole carrying two enclosed rectangular luminaires.
River Display Base (Hydroelectric Dam Infiltration)
Twenty by twenty-four metre ground and river presentation base with inset static blue tailwater and subtle surface streaks. Not a fluid simulation.
Dam and Powerhouse Maintenance Route (Hydroelectric Dam Infiltration)
Connected intake pressure train feeds a roofed turbine house and tailrace alongside the spillway, with a guarded maintenance courtyard and a marked crest road.









