Free models · CC0
Environments
Every environment below is a self-contained .glb under 5 MB, released under CC0 1.0 so it can be used and modified in commercial projects without attribution.
Load one straight from its CDN URL with a plain GLTFLoader, or take a whole environments set from the packs.
70 free GLB models
Shaft station cutaway review section (Underground Mine and Shaft Works)
A review variant of the shaft station with the east wall removed so the landing, guides, shaft sleeve and station fittings can be inspected and photographed from the side.
Shaft station chamber (Underground Mine and Shaft Works)
An 8 m square shaft station excavated at 5.6 m clear height, with arched drift openings north and south, a 3.6 m by 2.4 m shaft opening through the back, a lined shaft sleeve above with buntons and guides, a steel roof frame and a named landing gate.
Drift cutaway review section (Underground Mine and Shaft Works)
A review variant of the straight drift with the east half of the rock shell removed so the arched section, ditch, bolting and services can be inspected from the side.
Ore pass raise collar (Underground Mine and Shaft Works)
A tipping point over an ore pass raise: a concrete collar around a 2 m square opening, heavy grizzly bars, a kickboard kerb, a side chute and a control stand.
Drift dead end working face (Underground Mine and Shaft Works)
A 4 m drift module closed by a blasted rock face with a drilled round pattern, a broken muck pile at the toe and a face inspection light. One open drift port.
Widened chamber cutaway review section (Underground Mine and Shaft Works)
A review variant of the widened chamber with the east wall removed so the excavated interior, roof frame and equipment plinth can be inspected and photographed from the side.
Widened drift chamber (Underground Mine and Shaft Works)
A 6 m by 8 m widened chamber module for parking, pumping or storage, with arched drift openings at both ends, a heavier steel roof frame and a raised concrete equipment plinth.
Drift incline ramp (Underground Mine and Shaft Works)
An 8 m ramp module climbing 1 m at one in eight between two drift ports, with a shotcrete invert strip, kerb and wall lights.
Drift tee junction (Underground Mine and Shaft Works)
A 4 m flat backed intersection with three arched drift openings and a closed east wall, supported by four steel corner columns, a ring beam and roof bolts.
Drift cross junction (Underground Mine and Shaft Works)
A 4 m flat backed four way intersection with arched drift openings on every side, four steel corner columns, a ring beam grid and roof bolts.
Left hand drift curve (Underground Mine and Shaft Works)
The mirrored quarter turn drift, running from the north face to the west face on the same 4 m radius grid.
Right hand drift curve (Underground Mine and Shaft Works)
A quarter turn drift on a 4 m radius grid, running from the north face to the east face with lights on the outer wall and a compressed air line following the curve.
Steel arch set drift section (Underground Mine and Shaft Works)
A 4 m drift section supported by four rolled steel arch ribs on foot plates with steel lagging channels spanning between the ribs and two tie rods.
Shotcrete lined drift section (Underground Mine and Shaft Works)
A 4 m drift section finished with a sprayed shotcrete lining over welded mesh and resin bolts, with the ditch left open at the toe.
Timbered drift set section (Underground Mine and Shaft Works)
A 4 m drift section supported by four three-piece timber square sets with capping plates, angle braces and timber lagging packed against the back.
Straight mine drift 4 m (Underground Mine and Shaft Works)
A 4 m straight hard-rock drift module with a 3.2 m by 3.0 m arched clear section, thick rock shell, drainage ditch, resin rock bolts, a wall cable tray, compressed air and water lines and a bulkhead light.
Arched Den Threshold (Undercity Sewers and Thieves Den)
Dressed stone doorway and dry timber threshold marking the concealed den entrance.
Cistern Inspection Island (Undercity Sewers and Thieves Den)
Circular raised cistern inspection island with a short safety rail.
Weir Pool (Undercity Sewers and Thieves Den)
Broad shallow settling pool with a transverse stone overflow sill.
Rat Nest Heap (Undercity Sewers and Thieves Den)
Nest of rag scraps, straw-coloured lumps and short splinters; no live animals.
Brick Vault Junction (Undercity Sewers and Thieves Den)
Vaulted junction frame with an open cross channel and paired terminal masonry ribs.
Silt Bank (Undercity Sewers and Thieves Den)
Low accumulated silt bank formed from overlapping smooth sediment humps.
Debris Dam (Undercity Sewers and Thieves Den)
Tangled discarded beams and a rusted metal container blocking a channel edge.
Settling Tank (Undercity Sewers and Thieves Den)
Open settling tank with perimeter masonry and a central submerged baffle.