Free models · Game-ready GLB
Kit
Every modern model below is a self-contained .glb under 25 MB that drops into three.js, Blender, Godot, Unity and Unreal, free to use and modify in commercial projects without attribution.
Load one straight from its CDN URL with a plain GLTFLoader, or take a whole themed set from the packs.
4,574 free GLB models
Pottery Production Courtyard (Ceramics Pottery Studio)
Working courtyard with wheel throwing, clay preparation, glazing, firing and a stocked ceramics shop under the glazed production lean-to attached to a closed studio, with handwork and customer tables in the courtyard.
Dam and Powerhouse Maintenance Route (Hydroelectric Dam Infiltration)
Connected intake pressure train feeds a roofed turbine house and tailrace alongside the spillway, with a guarded maintenance courtyard and a marked crest road.
River Display Base (Hydroelectric Dam Infiltration)
Twenty by twenty-four metre ground and river presentation base with inset static blue tailwater and subtle surface streaks. Not a fluid simulation.
Floodlight Mast (Hydroelectric Dam Infiltration)
Four-metre anchored floodlight pole carrying two enclosed rectangular luminaires.
Life Ring Station (Hydroelectric Dam Infiltration)
Riverside rescue station with ring buoy, rope loop and storage box.
Warning Sign (Hydroelectric Dam Infiltration)
Freestanding warning plate with raised exclamation symbol on a galvanized post.
Guard Cabin (Hydroelectric Dam Infiltration)
Roofed security cabin with separate door, observation window, projecting eaves and concrete threshold.
Roofed Powerhouse (Hydroelectric Dam Infiltration)
Closed powerhouse with concrete sides, complete glazed roof and front glazing, service door and a low tailrace penetration. Five-metre square footprint. Roof glazing reveals machinery without a cutaway.
Security Gate (Hydroelectric Dam Infiltration)
Three-metre twin-leaf vertical-bar security gate with latch, posts and closed static leaves.
Rail End (Hydroelectric Dam Infiltration)
Terminating safety rail with a short returned handhold to prevent exposed ends.
Rail Corner (Hydroelectric Dam Infiltration)
Right-angle safety rail corner with continuous lower kickplates and top handrails.
Safety Rail Straight (Hydroelectric Dam Infiltration)
Two-metre safety railing with double rails, kickplate and foot plates.
Service Stair (Hydroelectric Dam Infiltration)
Eight-step service stair rising 1.4 metres with steel treads, inclined stringers and dual safety handrails.
Ladder Cage (Hydroelectric Dam Infiltration)
Three-metre fixed access ladder with eleven rungs and four protective cage hoops.
Access Hatch (Hydroelectric Dam Infiltration)
Square bolted access hatch with thick stepped cover, corner fasteners and recessed pull ring.
Pressure Gauge Manifold (Hydroelectric Dam Infiltration)
Three upright pressure gauges with dial faces, needles and separate copper sensing stems.
Drainage Sump (Hydroelectric Dam Infiltration)
Concrete drainage sump with raised metal grating and open collection void beneath.
Lubrication Skid (Hydroelectric Dam Infiltration)
Oil lubrication skid with reservoir, filter canister, copper delivery line and service panel.
Tool Cabinet (Hydroelectric Dam Infiltration)
Four-drawer maintenance tool cabinet with individual drawer fronts, pulls and corner guards.
Turbine Lifting Cradle (Hydroelectric Dam Infiltration)
Braced turbine service cradle with four inward-facing padded saddles and broad forklift base.
Chain Hoist (Hydroelectric Dam Infiltration)
Travelling trolley hoist with alternating chain links and bottom lifting hook. Model origin lies beneath hanging hook.
Workshop Bench (Hydroelectric Dam Infiltration)
Steel maintenance bench with bolted vice, opposed jaws, screw handle and lower tool shelf.
Maintenance Gantry (Hydroelectric Dam Infiltration)
Four-metre portable maintenance gantry with I-section beam, gusseted columns and broad feet.
Trench Cover (Hydroelectric Dam Infiltration)
One-metre steel trench cover with paired lifting slots and anti-slip ribs.