Free models · Game-ready GLB
Realistic
Every realistic model below is a self-contained .glb under 25 MB that drops into three.js, Blender, Godot, Unity and Unreal, free to use and modify in commercial projects without attribution.
Load one straight from its CDN URL with a plain GLTFLoader, or take a whole themed set from the packs.
11,733 free GLB models
Mesh fence foot block (Demolition and Site Clearance)
Moulded concrete fence foot 0.6 m long with two slotted sockets and a moulded handle recess, the block a temporary mesh panel stands in, modelled loose so a run of them can be dropped along a line.
Debris netting scaffold bay, 4 m (Demolition and Site Clearance)
Scaffold screen bay 4 m wide and 4 m tall: a tube and fitting frame of standards, ledgers and a plan brace carrying a blue debris netting panel laced to its edges, with side ports at 2 m so a screen runs along a demolition face.
Site hoarding gate panel, 4 m (Demolition and Site Clearance)
The same hoarding line as the site entrance: a 3.4 m sheeted leaf hung on a heavier post with a drop bolt and a latch keep, a red keep clear plate on the closing post, and the leaf swinging clear into the site.
Mesh site fence panel, 3.5 m (Demolition and Site Clearance)
Temporary mesh fence panel 3.5 m wide and 2 m tall in a tubular frame: welded mesh infill, a blue site information plate wired to the rail, and side ports at 1 m so a run of panels closes a compound.
Site hoarding panel, 4 m (Demolition and Site Clearance)
Solid site hoarding bay 4 m wide and 2.5 m tall: blue faced plywood sheeting on a timber frame between two charcoal posts on precast feet, with a capping rail, a blank cream notice board and a yellow warning plate, and side ports so a perimeter repeats.
Mud tracked site ground tile, 4 m (Demolition and Site Clearance)
The same 4 m site module with dried mud trodden across it by the plant: three spread patches standing a few millimetres proud of the slab with two wheel ruts run through them, for the working face and the haul line.
Crushed hardcore haul road tile, 4 m (Demolition and Site Clearance)
The same 4 m site module surfaced with crushed hardcore from the site's own crusher: a 90 mm bed of graded material with loose lumps scattered across it and a rolled crown down the middle, for the haul road and the crusher apron.
Demolition site ground tile, 4 m (Demolition and Site Clearance)
Heavy duty concrete site module 4 m square and 120 mm thick with saw cut joints running each way, laid so its top face is the running surface, with edge ports on all four sides so a whole clearance site repeats from it.
Check in and marshalling lanes (Ferry Terminal and Harbour Crossing)
The land side of the same terminal, closer in: three lanes of painted tiles running up to the check in booths, the barrier arms down and the lane numbers overhead, with two cars, a van and a tractor unit waiting their turn and the supervisor's hut on the kerb.
Ferry terminal at loading time (Ferry Terminal and Harbour Crossing)
A roll on roll off ferry terminal working a sailing: the ship lies astern of the linkspan with its stern ramp over the bridge deck, held off the quay by breasting dolphins and fender panels, and a car is already on the span. Behind it two shore ramps climb from the...
Wayfinding totem (Ferry Terminal and Harbour Crossing)
Double sided wayfinding totem 2.6 m tall: a blue panel on a charcoal plinth with cream direction bands and abstract arrow blocks, a lit strip at the head and a steel edge frame, for the concourse and the marshalling yard.
Covered foot passenger walkway, 4 m (Ferry Terminal and Harbour Crossing)
Covered walkway section 4 m long and 2.6 m wide: a steel deck 0.24 m up with a yellow edge strip, handrails on both sides, four posts and a charcoal canopy with a blue fascia. Ports at both ends so a run reaches from a terminal to a gangway tower.
Terminal lift and stair core (Ferry Terminal and Harbour Crossing)
Two storey circulation core 3.4 m square and 5.2 m tall: a glazed lift shaft with a charcoal car and blue call panels, a steel dogleg stair with a landing and handrails, and a grey machine housing on top.
Terminal toilets door module (Ferry Terminal and Harbour Crossing)
Washroom entrance module 2.6 m wide and 3 m tall: a grey lined wall with two charcoal doors that swing, blue pictogram plates over them, a lit sign box above and a yellow cleaning in progress board beside.
Boarding ticket gate (Ferry Terminal and Harbour Crossing)
Single width boarding gate 1.4 m across: two grey pedestals with charcoal tops, blue scanner plates and green pass lamps, and a pair of glazed leaves that slide back into the pedestals.
Luggage rack with cases (Ferry Terminal and Harbour Crossing)
Two tier luggage rack 2 m long: a steel frame with charcoal slatted shelves holding four hard cases in blue, red and grey, for the foot passenger lounge or the ship's stair lobby.
Terminal kiosk and cafe counter (Ferry Terminal and Harbour Crossing)
Concourse kiosk 3.2 m wide: a red fronted counter with a pale top, a coffee machine and a display case, a grey back unit with shelves of stock, a lit menu board and a charcoal canopy on two posts.
Passenger luggage trolley (Ferry Terminal and Harbour Crossing)
Nesting luggage trolley 1.1 m long: a steel basket on a charcoal frame with a red handle bar and a blue information plate, on four castors that roll.
Sailings departure board (Ferry Terminal and Harbour Crossing)
Freestanding sailings board 2.6 m wide and 2.8 m tall: a charcoal case on two steel legs with lit rows behind glass, a blue header band and a row of split flaps along the bottom that tilts as the board updates.
Terminal seating bank, 2 m (Ferry Terminal and Harbour Crossing)
Four seat waiting bank 2 m long: blue moulded shells with charcoal arms on a steel beam and two feet, with a shared charcoal parcel shelf underneath. Ports at both ends so a row runs the length of a concourse.
Terminal roof section, 4 m (Ferry Terminal and Harbour Crossing)
Flat terminal roof cassette 4 m square and 0.42 m deep: a steel deck on charcoal ribs with a grey upstand, a blue fascia band and a rooflight, for roofing a concourse built from facade bays.
Foot passenger check in desk run (Ferry Terminal and Harbour Crossing)
Three position check in counter 6 m long: a blue fronted desk with a pale worktop, screens and card readers on each position, a grey back gantry with lit position panels and a charcoal kick rail.
Terminal entrance bay with sliding doors (Ferry Terminal and Harbour Crossing)
The same 4 m facade module as an entrance: a 2.4 m opening with two glazed leaves that slide apart into the side glazing, a charcoal head box with the operator above them and a yellow threshold strip in the floor.
Terminal facade bay, 4 m (Ferry Terminal and Harbour Crossing)
Glazed terminal facade module 4 m wide and 3.6 m to the eaves: a concrete cill, full height glazing in charcoal mullions, a blue spandrel band under a grey head and a steel eaves flashing. Ports at both ends so a frontage repeats.