3DAssets.dev
3

3D Assets

@3dassets

Site cabin on blocks (Demolition and Site Clearance)Animated

Site cabin on blocks (Demolition and Site Clearance)

Portable site cabin 6 m by 2.4 m standing on stacked concrete blocks: a cream clad body on steel skids with a charcoal base rail, three sliding windows, a blue banded door up two steps, lifting eyes at the corners and a blank notice plate.

@3dassets744 tris
Lifting magnet attachment on its stand (Demolition and Site Clearance)

Lifting magnet attachment on its stand (Demolition and Site Clearance)

Excavator lifting magnet 1.6 m across on a site stand: a charcoal magnet disc with a steel wear plate and a lifting bail, the generator lead coiled on its hook, and a yellow tubular stand with a warning plate, the attachment that picks rebar and scrap out of the arisings.

@3dassets572 tris
Tracked screening plant (Demolition and Site Clearance)

Tracked screening plant (Demolition and Site Clearance)

Tracked screening plant 13 m long: a grey chassis on crawler tracks, a yellow feed hopper, a double deck inclined screen box under its mesh, a power unit, and three product conveyors throwing fines, sand and oversize into their own cones beside the crusher.

@3dassets2.4k tris
Tracked jaw crusher (Demolition and Site Clearance)

Tracked jaw crusher (Demolition and Site Clearance)

Tracked mobile jaw crusher 12 m long: a grey chassis on wide crawler tracks, a yellow feed hopper with folding walls and a vibrating grizzly feeder, the jaw box and its flywheel guard, a power unit, and a product conveyor with an overband magnet over its head drum.

@3dassets2.5k tris
Towable dust suppression bowser (Demolition and Site Clearance)Animated

Towable dust suppression bowser (Demolition and Site Clearance)

Site water bowser 3 m long on a two wheel chassis: a blue tank with steel bands, a filler hatch and a walkway, a pump set in a charcoal cabinet, a damping down hose on a reel that turns, a spray lance in its holster and red warning plates.

@3dassets1.4k tris
Telehandler with telescopic boom (Demolition and Site Clearance)Animated

Telehandler with telescopic boom (Demolition and Site Clearance)

Rough terrain telehandler 5.6 m long: a yellow body with a side engine pod and a glazed cab, four wheels that roll, a telescopic boom that raises on its rear pivot and an extension section that reaches out with the fork carriage on the end.

@3dassets1.3k tris · 1 ↓
Articulated dump truck (Demolition and Site Clearance)Animated

Articulated dump truck (Demolition and Site Clearance)

Six wheel articulated hauler 10.5 m long: an orange tractor unit with a glazed cab, an exhaust stack and a hitch, a charcoal chassis carrying a steel body with a ribbed floor and a canopy, six wheels that roll and a body that tips on its rear pivot.

@3dassets1.7k tris
Site dumper with tipping skip (Demolition and Site Clearance)Animated

Site dumper with tipping skip (Demolition and Site Clearance)

Front tip site dumper 3.6 m long on four chunky tyres: an orange chassis with a charcoal engine bay, a roll bar over the operator seat with a steering wheel and control lever, and a steel skip that tips forward on its front pivot to shed rubble.

@3dassets1.1k tris
Skid steer loader with sorting grapple (Demolition and Site Clearance)Animated

Skid steer loader with sorting grapple (Demolition and Site Clearance)

Compact skid steer 3.4 m long on four solid tyres: an orange body with a guarded glazed cab, side lift arms that raise and a sorting grapple on the coupler whose top jaw opens, the machine that picks salvage out of a pile.

@3dassets1.5k tris
Wheeled loader with tipping bucket (Demolition and Site Clearance)Animated

Wheeled loader with tipping bucket (Demolition and Site Clearance)

Articulated wheeled loader 7.4 m long: a yellow rear body with the engine hood, counterweight and exhaust, a glazed cab on the articulation joint, four wheels that roll, a boom that raises and a toothed rehandling bucket that tips, the machine that feeds the crusher.

@3dassets1.5k tris
High reach demolition excavator (Demolition and Site Clearance)Animated

High reach demolition excavator (Demolition and Site Clearance)

High reach demolition machine 14 m tall on a widened tracked base: a yellow house with a tilting guarded cab and screens, a three piece boom standing up to the top of a building and a pulveriser jaw head parented to it, the machine that takes a structure down floor by floor.

@3dassets2.5k tris · 1 ↓
Tracked excavator with hydraulic breaker (Demolition and Site Clearance)Animated

Tracked excavator with hydraulic breaker (Demolition and Site Clearance)

The same excavator with the bucket swapped for a hydraulic breaker: a charcoal hammer box on the quick coupler with a moil point chisel and hose stubs, hung off the boom as a parented node so it travels with the raise, the tool a controlled demolition works a slab with.

@3dassets2.4k tris
Tracked excavator with digging bucket (Demolition and Site Clearance)Animated

Tracked excavator with digging bucket (Demolition and Site Clearance)

Twenty two tonne tracked excavator 9 m long: a yellow house with a glazed cab, a counterweight and a ribbed engine deck on a slew ring, a boom and dipper that raise on the foot pin and a toothed digging bucket parented to them, so the two travel together.

@3dassets2.3k tris · 5 ↓
Tracked bulldozer with raising and angling blade (Demolition and Site Clearance)Animated

Tracked bulldozer with raising and angling blade (Demolition and Site Clearance)

Twenty tonne tracked bulldozer 6.2 m long: an orange body with a glazed cab and a ribbed engine hood, a straight moldboard 3.8 m wide on push arms that raise, a moldboard that angles on its centre ball, a three shank ripper at the back and modelled crawler tracks.

@3dassets2.2k tris
Timber waste pile (Demolition and Site Clearance)

Timber waste pile (Demolition and Site Clearance)

Sorted timber waste 3 m across: joists, floorboards and stud offcuts stacked criss cross with the nails drawn, a broken door leaf leaning on the stack and a cream waste stream plate on a stake, the segregated pile a clearance keeps for the timber skip.

@3dassets468 tris
Cut rebar bundle (Demolition and Site Clearance)

Cut rebar bundle (Demolition and Site Clearance)

Bundle of reinforcement cut out of the slab: forty bars 4 m long wired into two banded bunches on a timber bearer, ends sheared square, with two bent tails sticking out of the bundle and a red end cap tray beside it.

@3dassets1.1k tris
Salvaged steel beam bundle (Demolition and Site Clearance)

Salvaged steel beam bundle (Demolition and Site Clearance)

Six cut universal beams 6 m long stacked on timber bearers: flanged sections with torch cut ends, web holes where the connections were, a steel banding strap and a painted end mark, sorted out of the demolition for the scrap merchant.

@3dassets696 tris
Salvaged brick stack on pallets (Demolition and Site Clearance)

Salvaged brick stack on pallets (Demolition and Site Clearance)

Reclaimed brick banded onto two timber pallets 2.4 m long: cleaned bricks stacked in header and stretcher courses under a steel banding strap, with a cream tally plate wired to the stack, the way salvage is set aside on a clearance.

@3dassets1.1k tris
Graded crusher feed pile (Demolition and Site Clearance)

Graded crusher feed pile (Demolition and Site Clearance)

Feed stock sorted for the crusher: a 4 m heap of picked concrete with the reinforcement cut out, a lower apron of crushed product beside it and the bucket tracks pushed into the toe, the way a feed pile is kept clean.

@3dassets1.6k tris
Rubble pile, large (Demolition and Site Clearance)

Rubble pile, large (Demolition and Site Clearance)

The same arisings at 6 m across and 2.2 m high, the stockpile a site pushes up before the crusher takes it: broken concrete, brick and steel settled into a long heap with a loose scattered surface.

@3dassets2.2k tris
Rubble pile, small (Demolition and Site Clearance)

Rubble pile, small (Demolition and Site Clearance)

The same arisings at 2 m across and 0.7 m high, the size that gathers at the foot of a wall between passes: broken concrete, brick and steel with a loose scattered surface.

@3dassets816 tris
Rubble pile, medium (Demolition and Site Clearance)

Rubble pile, medium (Demolition and Site Clearance)

Heap of demolition arisings 3.4 m across and 1.2 m high: broken concrete, brick and a little steel settled into the shape a dozer blade leaves, with a scattered surface of loose lumps, for the middle of a clearance.

@3dassets1.4k tris
Demolition wall section, down to rubble (Demolition and Site Clearance)

Demolition wall section, down to rubble (Demolition and Site Clearance)

The same 4 m bay after the wall is down: a 500 mm stub of brickwork on the footing with the broken face showing, a heap of graded masonry rubble across the bay and two lengths of bent rebar lying in it, ready for the loader.

@3dassets612 tris
Floor slab section with rebar showing, 4 m (Demolition and Site Clearance)

Floor slab section with rebar showing, 4 m (Demolition and Site Clearance)

Broken reinforced floor slab 4 m square and 220 mm thick: a saw cut edge on two sides, a ragged broken edge on the others with the reinforcement mesh bent up out of it, a screed patch lifted clear and ground ports on all four sides.

@3dassets552 tris