Free models · Game-ready GLB
Kit
Every modern model below is a self-contained .glb under 25 MB that drops into three.js, Blender, Godot, Unity and Unreal, free to use and modify in commercial projects without attribution.
Load one straight from its CDN URL with a plain GLTFLoader, or take a whole themed set from the packs.
4,574 free GLB models
Cable Trench Corner (Hydroelectric Dam Infiltration)
Right-angle concrete cable trough with curved cable dressing and thick outer retaining walls.
Cable Trench (Hydroelectric Dam Infiltration)
Two-metre open concrete cable trough with three separate insulated cable runs.
Insulator Bank (Hydroelectric Dam Infiltration)
Three tall porcelain standoff insulators with seven sheds each and copper terminal studs.
Switchgear (Hydroelectric Dam Infiltration)
Double-height switchgear cubicle with deadfront panel, handle and lower ventilation strips.
Transformer (Hydroelectric Dam Infiltration)
Oil-cooled transformer with finned radiator banks, three ribbed bushings and bolted skid.
Control Console (Hydroelectric Dam Infiltration)
Standing control desk with wide status screen, three rotary controls and braced lower shelf.
Governor Cabinet (Hydroelectric Dam Infiltration)
Turbine governor cabinet with screened operator panel, toggle controls, hinges and recessed service door.
Generator Housing (Hydroelectric Dam Infiltration)
Vertical generator housing with radial cooling ribs, terminal box, mounting ring and end cap; fits turbine crown.
Penstock Support (Hydroelectric Dam Infiltration)
Concrete pressure-pipe saddle with a complete steel support band and anchor studs.
Trash Rack (Hydroelectric Dam Infiltration)
Four-metre intake screen with fifteen spaced bars, four crossrails and thick surrounding frame.
Rack Cleaning Carriage (Hydroelectric Dam Infiltration)
Rack-cleaning trolley with four rail wheels, winch housing, guide arm and comb rake. Static mechanism.
Stilling Basin (Hydroelectric Dam Infiltration)
Six-metre open stilling basin with nine baffle blocks, sidewalls and a static shallow water surface.
Crest Roadway (Hydroelectric Dam Infiltration)
Four-metre crest roadway slab with narrow safety edge markings and raised concrete verges.
Spillway Chute (Hydroelectric Dam Infiltration)
Eight-metre stepped spillway chute dropping 3.6 metres, with continuous raised sidewalls and energy-dissipating steps.
Crest Barrier (Hydroelectric Dam Infiltration)
Heavy concrete crest traffic barrier with a profiled base and metal coping.
Bonded freight inspection yard (Container Inspection and Customs Yard)
A screened weighing lane beside a roofed cargo inspection shed, sample storage, customs office and controlled visitor entrance.
Abutment (Hydroelectric Dam Infiltration)
Stepped mass-concrete bank abutment with crown blocks and broad retaining foot.
Dam Wall Return (Hydroelectric Dam Infiltration)
L-shaped six-metre dam return tying the crest into a riverbank abutment.
Exit Checkpoint Gate (Container Inspection and Customs Yard)
Exit checkpoint arm with clearance display, beacon and cabinet fittings.
Visitor Bench (Container Inspection and Customs Yard)
Waiting bench with separated slats, backrest, armrests and anchor feet.
Document Transfer Hatch (Container Inspection and Customs Yard)
Counter-mounted document transfer drawer with external handle and hinges.
Freight Sample Shelving (Container Inspection and Customs Yard)
Braced sample shelf with nine secured freight sample boxes.
Inspection Pit Cover (Container Inspection and Customs Yard)
Load-cover grille for an inspection pit with lifting pads and frame bolts.
Spill Kit Cart (Container Inspection and Customs Yard)
Wheeled spill-response kit with two sealed pails and absorbent pack.