{"data":{"id":"13392","slug":"ore-processing-and-haulage-plant-conveyor-gallery-incl-4a3a6249","title":"Conveyor gallery bridge, 12 m rising span (Ore Processing and Haulage Plant)","summary":"A 12 m conveyor gallery that climbs 3 m between transfer towers: the same braced through truss and sheeting with a rising bottom chord, stepped bearing shoes, the belt and idlers set on the slope and a climbing internal walkway.","description":"A 12 m conveyor gallery that climbs 3 m between transfer towers: the same braced through truss and sheeting with a rising bottom chord, stepped bearing shoes, the belt and idlers set on the slope and a climbing internal walkway. Dimensions 4.49 by 7.32 by 12.33 m (X by Y by Z), metre units, +Y up, +Z forward, resting on y=0. Belt ports belt-a at 0.00, 2.40, -6.00; belt-b at 0.00, 5.40, 6.00. Static geometry; no rig, collision or navigation data.","status":"published","url":"https://3dassets.dev/assets/ore-processing-and-haulage-plant-conveyor-gallery-incl-4a3a6249","cdnUrl":"https://cdn.3dassets.dev/assets/13392/v1/model.glb","downloadUrl":"https://3dassets.dev/download/ore-processing-and-haulage-plant-conveyor-gallery-incl-4a3a6249","thumbnailUrl":"https://cdn.3dassets.dev/assets/13392/v1/thumb.webp","posterUrl":"https://cdn.3dassets.dev/assets/13392/v1/poster.webp","blurhash":"U6CGPvog00%M~qt7IUt700Ri-;WB00IU%MWB","category":{"slug":"roads-infrastructure","title":"Roads & Infrastructure"},"tags":[{"slug":"modern","title":"Modern"},{"slug":"realistic","title":"Realistic"},{"slug":"modular","title":"Modular"},{"slug":"kit","title":"Kit / Set"},{"slug":"exterior","title":"Exterior"}],"license":{"slug":"cc0-1.0","name":"CC0 1.0 Universal","url":"https://creativecommons.org/publicdomain/zero/1.0/","attributionRequired":false},"contributor":{"username":"3dassets","name":"3D Assets","url":"https://3dassets.dev/u/3dassets"},"stats":{"fileSize":133888,"triangles":2692,"vertices":8076,"meshes":6,"materials":6,"textures":0,"animations":[],"boundingBox":{"min":[-2.2485338913407364,-0.000005977912756360837,-6.16544246673584],"max":[2.2420953976120988,7.321265994256426,6.16544246673584]},"sizeMeters":[4.491,7.321,12.331],"hasDraco":false,"hasMeshopt":false,"hasKTX2":false,"extensionsUsed":["KHR_mesh_quantization"]},"aiGenerated":true,"aiModel":"Claude Fable 5.1","downloads":0,"publishedAt":"2026-09-07T15:37:42.613Z","updatedAt":"2026-09-07T15:37:42.719Z","usage":{"threejs":"import { GLTFLoader } from 'three/addons/loaders/GLTFLoader.js'\n\nconst loader = new GLTFLoader()\nloader.load('https://cdn.3dassets.dev/assets/13392/v1/model.glb', (gltf) => {\n  scene.add(gltf.scene)\n})","r3f":"import { useGLTF } from '@react-three/drei'\n\nexport function ConveyorGalleryBridge12MRisingSpanOreProcessingAndHaulagePlant(props) {\n  const { scene } = useGLTF('https://cdn.3dassets.dev/assets/13392/v1/model.glb')\n  return <primitive object={scene} {...props} />\n}\nuseGLTF.preload('https://cdn.3dassets.dev/assets/13392/v1/model.glb')","modelViewer":"<model-viewer src=\"https://cdn.3dassets.dev/assets/13392/v1/model.glb\" alt=\"Conveyor gallery bridge, 12 m rising span (Ore Processing and Haulage Plant)\" camera-controls auto-rotate></model-viewer>","blender":"# Blender 4.x: File > Import > glTF 2.0, or from the Python console after downloading the file.\nimport bpy\nbpy.ops.import_scene.gltf(filepath='model.glb')  # from https://cdn.3dassets.dev/assets/13392/v1/model.glb\n# Metres and +Y up are converted to Blender's Z-up scene automatically.","godot":"# Godot 4: copy model.glb into res://models/ and the editor imports it as a scene.\nvar packed := load(\"res://models/model.glb\") as PackedScene\nvar model := packed.instantiate()\nadd_child(model)","unity":"// Unity: import model.glb with glTFast (Package Manager: com.unity.cloud.gltfast) and drag the prefab in,\n// or load it at runtime straight from the CDN:\nusing GLTFast;\nvar gltf = new GltfImport();\nif (await gltf.Load(\"https://cdn.3dassets.dev/assets/13392/v1/model.glb\")) await gltf.InstantiateMainSceneAsync(transform);"}}}